OnSAP

Collaborative Q&A for SAP technies

Is is possible to have always fixed pegging in APO?

Up

0

Down

Even after setting up the fixed pegging option in the product master of APO the system seems to be creating dynamic pegging relationships. It seems to need the heuristic SAP_PP_019 to run in order to fix the pegging.

Is it possible to have the system always fix the pegging after any ATP / planning change?

apo pegging

Created on Sep 11, 2009 11:29:14 AM by Pedro Lima (60) 2 1.

Last change on Sep 11, 2009 11:34:58 AM by Pedro Lima (60) 2 1.

This post was edited 1 time. Show revisions

Replies

Nobody has replied yet

Why not be the first?